Hi all, only my third post! For those that are interested in these things my order went in on June 23 and accepted June 29. Currently I am at code 2500 from the list:
1000 - Order Request Accepted by GM
1100 - Preliminary Order Accepted
2000 - Accepted by GM
2500 - Preferenced
3000 - Accepted by Production Control
3100 - Available to Sequence
3300 - Scheduled for Production
3800 - Vehicle Produced (invoice created)
4000 - Available to Ship
4200 - Shipped (rail-car)
4300 - Intermediate Delivery (usually when the vehicle is switching rail-cars at a distribution hub)
4800 - Rail Ramp Unload (when the vehicle is unloaded from the rail-car and loaded onto the transport truck)
5000 - Delivered to Dealer
Getting to code 3300 is key, then I'll know when it will get built. According to the last rumor I heard, the new LY7 motors won't be available to the Orion G6 factory until August.
Cheers, Bean
1000 - Order Request Accepted by GM
1100 - Preliminary Order Accepted
2000 - Accepted by GM
2500 - Preferenced
3000 - Accepted by Production Control
3100 - Available to Sequence
3300 - Scheduled for Production
3800 - Vehicle Produced (invoice created)
4000 - Available to Ship
4200 - Shipped (rail-car)
4300 - Intermediate Delivery (usually when the vehicle is switching rail-cars at a distribution hub)
4800 - Rail Ramp Unload (when the vehicle is unloaded from the rail-car and loaded onto the transport truck)
5000 - Delivered to Dealer
Getting to code 3300 is key, then I'll know when it will get built. According to the last rumor I heard, the new LY7 motors won't be available to the Orion G6 factory until August.
Cheers, Bean