Pontiac G6 Forum banner
1 - 2 of 2 Posts

· Registered
Joined
·
28 Posts
Coupe Production

Production was supposed to begin 6/6/05. Production is 1 shift at 61 jph=488 per day, but I think that is for coupes and sedans. But Orion will be doing summer shutdown. 7/4/05 and 7/11/05. They will be starting two shifts after the startup again in July.
 
1 - 2 of 2 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top